Church Cottage Building Progress
Photos are in approximate reverse order, so start at the bottom of the list to see the rooms before the building work was started.
Fireproofing the pipes from upstairs
Plaster is drying out
Plaster is drying out
Plaster is drying out
Plaster is drying out
Front door and fire alarm panel
Bathroom Fan is installed
Front Bedroom storage
Back Bedroom storage
Stairs from top
Plaster is drying out
Plaster cover wall end
Plaster around new door
Steel beam in position
Steel beams in position
Steel beam and props
Steel beam and props
Steel beam in position
Steel beam ready for padstone
Steel beam
The steel beam lift
Cut wall ready for doorway
Steel beams ready to lift
Steel beam ready to lift
Steel beam ready to lift
Steel beam ready to lift
Props in position
Props in position
Propping unsupported floor beams
Wall ready to be built up for padstone
Cut wall ready for doorway
View from stairs with wall removed
Beams in position ready for demolition
Beams only just fit when section of wall is removed
Beams only just fit when section of wall is removed
Beams only just fit when section of wall is removed
Plaster is removed first
Plaster is removed first
Floor below new boiler repaired
Pipework below new boiler
New boiler in position
Concrete floor to be broken out
Redundant steel pipes to be removed
Waste and water pipes
Pipes and cables to be removed
Kitchen end
Lounge
Lounge
Kitchen and lounge doorway
Kitchen
Kitchen-diner
Kitchen end
Visualisation of new kitchen area
Visualisation of main meeting room
Visualisation of main meeting room
Visualisation of main meeting room
Visualisation of main meeting room
Visualisation of main meeting room
Visualisation of main meeting room
Visualisation of main meeting room